Capital Improvement Projects
- Crack Seal Program 2022
- South River Street Bridge Permanent Repair
- Orlando Drive Bridge Replacement
- Brainerd Park Softball Proposed Field
- Powder Hollow Baseball Field Improvements
- Higgins Park
- Elm Street Sidewalk Gap Community Connectivity Grant
- Town Farm Road Multi-Use Path LOTCIP
- 45 Kimberly Drive Drainage Outlet Design
- 2022 School Parking Lot Replacements
South River Street Bridge Permanent Repair (Replacement)
Project Update as of June 23, 2022:
The Town has received funding for the replacement of South River Street Bridge. The estimated construction cost for this project is approximately $2.4 million. This project is anticipated to be undertaken with 80 percent Federal funds and 20 percent Town funds. The Town is currently working with a design consultant and the State on the design. The State has approved the preliminary design. There are right-of-way impacts associated with the proposed improvements. These impacts consist of various temporary and permanent rights and easements necessary for construction and maintenance of the bridge, as well as a total acquisition necessary for the realignment of South River Street starting at the Main Street intersection.
The Town of Enfield conducted a Public Hearing concerning South River Street Bridge Replacement, State Project No. 48-198 – jointly with Connecticut River Access Path, State Project No. 48-190 - on April 17, 2019 in the Enfield Town Hall, Council Chambers.
DPW and a representative of State DOT presented the preliminary design for South River Street Bridge Replacement, State Project No. 48-198 to Town Council at the May 6, 2019 Town Council Meeting. The State required Town Council endorsement of the preliminary design for the bridge because it entails property acquisition. After the presentation, Town Council endorsed both the South River Street Bridge Replacement design and the Connecticut River Access Project design.
Bids for replacement of the bridge has been advertised with the bid opening scheduled for July 6, 2022. Construction of the bridge is scheduled for Spring 2023.
South River Street Bridge Project Public Hearing Notice
Enfield Projects Public Hearing Presentation COMBINED DRAFT 3 (PDF)
Contact: John Cabibbo, P.E - Assistant Town Engineer
Street: South River Street
Designer: GM2 Associates
Inspector: GM2 Associates
Contractor: TBD
Designer: GM2 Associates
Inspector: TBD
Contractor: TBD
Project Update
Construction RFP bids opened June 22, 2022. Plan for start of construction in 2022.